|
New Build, Ashley House, Wellsbourne Health Centre, Brighton, Project Value - £1,500,000 Project Length - 10 months The project down in Brighton consists of a 5 GP medical centre with a pharmacy. The practice had outgrown its existing premises and is currently operating from a converted house in the town centre with limited parking. Ashley House were appointed to provide a solution to relocate the practice into expanded premises from which they can extend the number of healthcare services available. We were appointed by Ashley House to build the two storey, modern, DDA compliant premises offering flexible accommodation, expansion space and ample parking all within half a mile of the existing premises. |
|
Read more...
|
|
|
Gilbert-Ash, Ministry of Defence, Hanger 22, Thorney Island Barracks, Project Value - £250,000 Project Length - 3 months Hanger 22 at Thorney Island Barracks is used to store military vehicles and other such equipment. Our job here was to fireproof the hanger. Great skill and expertise were needed to fix superlux fireproof board to the ceilings, as it was over 11 meters in the air. |
|
Read more...
|
|
Life Residential Arizona Building Deptford, London Project Value - £12,000 Project Length - 2 weeks In this block of new build studio flats, the washing machine in flat 111 had leaked. Luckily the damage was concentrated to this one flat but the damage was still substantial. |
|
Read more...
|
|
|
Chartwell Monaco Appleby House, 46. St. James Place London Project Value - £20,000 Project Length - 1 month Our contract with Chartwell involved the complete refurbishment of their London office in the heart of the capital. A complete strip out of the old fixtures and fittings was followed by making good the walls, ceilings and floors. |
|
Read more...
|
|
Gas Station (Clothing Store) Victoria Shopping Centre Royal Tunbridge Wells Project Value - £25,000 Project Length - 2 months Our work at this project consisted of removing fixtures and fittings from the previous shop and refurbishing the electrics and plumbing and then a new sprinkler system was installed. |
|
Read more...
|
|
|
|
|
<< Start < Prev 1 2 Next > End >>
|
|
Page 1 of 2 |